System components

COVERiT Roof Penetrations

Route ventilation and services through the EPDM roof.

Roof cable penetration with 180-degree bend, outlet clamp, EPDM flange and long lower pipe.
Product image edited with AI assistance.

Roof vent or cable route?

The weldable NovoProof® pipe sleeve is intended for the NovoProof® EPDM connection. The separately listed bitumen base element is a different connection option.

  • Black roof vent with rain hood, EPDM flange and long lower pipe.

    Roof vent with rain hood

    The roof vent carries a PE pipe through the roof waterproofing. A NovoProof® sleeve that can be welded around its perimeter forms the connection to the EPDM membrane. A clamping band, rain deflector and rain hood complete the pipe assembly. Pipe sizes DN 70, 100, 125 and 150 are listed.

    DN 70, 100, 125, 150 mmpipe length 1,000 mm

    EPDM flange 300 × 300 mm (DN 70, 100)

    EPDM flange 500 × 500 mm (DN 125, 150)

  • Roof cable penetration with 180-degree bend, outlet clamp, EPDM flange and long lower pipe.

    Cable entry with a 180° bend

    The cable entry uses a 180° pipe bend to turn the cable route downwards. An EPDM rain cap finishes the opening. The described assembly also includes the pipe, NovoProof® sleeve, clamping band and rain deflector. This version is listed in DN 100 and DN 150.

    DN 100, 150 mmpipe length 1,000 mm

    EPDM flange 300 × 300 mm (DN 100)

    EPDM flange 500 × 500 mm (DN 150)

  • Match the connection components

    The components are also listed individually, from the PE pipe and sleeve to the clamping band and rain protection. Select parts that match the pipe diameter and waterproofing material. The information sheet below shows the individual components, pipe lengths and flange dimensions.

Product images partly edited with AI assistance

Product images partly edited with AI assistance

Individual components

All parts of the roof vent and cable entry are also available individually.

  • Black PE pipe

    Black PE pipe

    Pipe for the roof vent and cable entry.

    DN 70, 100, 125, 150 mm

    Pipe length 1,000 mm

  • NovoProof® pipe sleeve

    NovoProof® pipe sleeve

    Connection to the EPDM waterproofing, weldable around its perimeter.

    DN 70, 110, 125, 150 mm

    Height 300 mm

  • Stainless steel clamp

    Stainless steel clamp

    Secures the sleeve against slipping.

    DN 60–80 mm

    DN 110–130 mm

    DN 140–160 mm

  • EPDM rain deflector

    EPDM rain deflector

    EPDM rain deflector per pipe diameter.

    DN 70 / 87–108 mm

    DN 100 / 120–135 mm

    DN 125 / 152–160 mm

  • Black PA rain hood

    Black PA rain hood

    Top cover of the roof vent.

    DN 70, 100, 125, 150 mm

  • Black 180° pipe bend

    Black 180° pipe bend

    Turns the cable route downwards at the cable entry.

    DN 100, 150 mm

  • EPDM rain cap

    EPDM rain cap

    Top cover of the cable entry.

    DN 100, 150 mm

  • Bitumen base element

    Bitumen base element

    A different connection option from the NovoProof® pipe sleeve.

    DN 70, 100, 125, 150 mm

    Flange ø 480 mm

AI-generated product illustrations based on the original product documentation.

AI-generated product illustrations based on the original product documentation.

Installing the penetration

  • Choose the version One-piece penetrations for single-skin roofs, two-piece penetrations with lower and upper part for double-skin roofs.
  • Install and fix Install the penetration and fix it to the substructure.
  • Connect the lower layer On a double-skin roof connect it to the vapour barrier, on a single-skin roof to the first waterproofing layer.
  • Connect the sleeve Make the connection with the factory-prefabricated NovoProof® sleeve, secure it against slipping with a stainless steel clamp and seal it with NovoProof® connection paste.
  • Weld the overlaps Weld the overlaps homogeneously using the ThermoFast® joining technique. The manufacturers’ processing guidelines apply (see the specification text).

Applications

  • Ventilation

    Route soil vents and vent pipes with a cover hood through the waterproofing.

  • Cable routes

    Route cables through the waterproofing; the 180° bend turns the cable route downwards.

  • Solar cables

    Solar penetrations with a double pipe bend, one-piece or two-piece.

  • Warm roof

    Roof vent in a warm roof with a loosely laid membrane under gravel.

Planning notes

The pipe diameter determines the parts: EPDM flange 300 × 300 mm for DN 70 and 100 mm, 500 × 500 mm for DN 125 and 150 mm. Select the clamp, rain deflector and rain hood to suit the pipe diameter.

Specify the sleeve version (closed, open on one side, vertical or conical) in the bill of quantities; the items are listed in the specification text.

The detail drawing shows a standard construction. It must be checked, adapted and completed for each project.

Planning documents

Reset search and filters

Additional filters

Document type
Document type
Scope
Scope
File format
File format

3 / 3

Browse all downloads →

of

Complementary system products

Product images partly edited with AI assistance

Product images partly edited with AI assistance

Plan the roof penetrations for your roof