NovoWeld bonds COVERiT NovoProof® EPDM waterproofing by induction welding to load-distribution plates screwed into the substructure. Prefabricated, flame-retardant DA-F sheets are held securely in position without additional ballast.

Roofer placing the orange hand inductor on the EPDM membrane.
Original photograph from the NovoWeld information sheet, restored with AI assistance.

What is NovoWeld?

NovoWeld is the field fastening system for COVERiT NovoProof® DA-F sheets (also DA-PF in documents) and DA-FG membranes. Coated NovoWeld load-distribution plates are spread evenly across the roof and fasten the entire roof build-up to the substructure. The loose-laid waterproofing lies on top and is welded to the plates point by point with the isoweld® 3000 induction welder. The fasteners stay beneath the waterproofing; the membrane is not drilled through.

The induction welding method was developed in cooperation with a renowned manufacturer of roof fastening systems. After the site survey, a project-specific wind-load calculation defines the grid in which the induction plates are screwed down.

Along roof edges, valleys, upstands and roof penetrations, the sheet is fastened linearly with the NovoWeld system at a spacing of approx. 25 cm.

How NovoWeld works

  • Plan and calculate Complete the data collection sheet. A wind-load calculation to DIN EN 1991-1-4/NA determines the number and position of the fixing points.
  • Set the plates Mark out the fixing points on the thermal insulation and screw the NovoWeld plates into the substructure with system-tested fasteners.
  • Lay the membrane Roll out the NovoProof® DA-F sheet or DA-FG membranes loose. Weld the overlaps homogeneously with ThermoFast® jointing.
  • Mark the points Mark the position of the fixing points on the waterproofing.
  • Calibrate the tool Switch on the isoweld® 3000 induction welder, select EPDM and enter the membrane thickness.
  • Bond by induction Weld every fixing point to the membrane with the hand inductor, directly after laying.
  • Let it cool Place a magnet on the weld point for at least 1 minute until it has cooled.

Installation follows the manufacturers’ laying guidelines and the NovoWeld information sheet.

The process in pictures

From fixing the plates to cooling the weld points: photographs from the NovoWeld information sheet show the installation steps from different viewpoints.

  • NovoWeld fixing plates screwed down on the insulation.

    Set the plates

    Fixing points marked out on the insulation, plates screwed down.

  • Loose-laid EPDM sheet with natural folds and raised edges.

    Lay out the sheet

    Lay out and align the prefabricated sheet over the fixed plates.

  • Three marked fixing points beside an EPDM membrane seam.

    Mark the points

    Mark the position of the fixing points on the waterproofing.

  • Original isoweld control display with EPDM material selection.

    Calibrate the tool

    Select EPDM and the actual material thickness, then calibrate according to the manufacturer's instructions. The historical display photograph is not a setting specification for the DA-F sheet.

  • Roofer placing the orange hand inductor on the EPDM membrane.

    Bond by induction

    Weld the fixing point to the membrane.

  • Four cooling magnets on welded fixing points of the EPDM membrane.

    Let it cool

    Place a magnet on the weld point for at least 1 minute.

Original photographs from the NovoWeld information sheet, restored with AI assistance. Fixing layout and installation follow the project-specific design and manufacturer's instructions.

Original photographs from the NovoWeld information sheet, restored with AI assistance. Fixing layout and installation follow the project-specific design and manufacturer's instructions.

What sets NovoWeld apart

  • No penetration of the waterproofing

    The fasteners sit beneath the membrane. The waterproofing is welded to the plates, not drilled through.

  • Independent of sheet edges

    The fixing points lie in the field, not in the seam.

  • Any laying direction

    The laying direction of the membrane can be chosen freely.

  • Insulation fastened as well

    The plates fasten the entire roof build-up. No additional fastening of the thermal insulation is needed.

  • No additional ballast

    Prefabricated DA-F sheets are held in position without gravel or paving ballast.

  • Self-calibrating welder

    The isoweld® 3000 is set to EPDM and the membrane thickness and has an integrated safety function.

  • With the DA-P sheet as well

    The induction method can also be combined with the NovoProof® DA-P sheet, for example where the structure cannot carry a heavy green roof and a lightweight green roof is planned.

System properties according to the NovoWeld information sheet. Applies to approved NovoProof® roof build-ups with system-tested fasteners.

Suitable substrates

  • Timber

  • Concrete

  • Profiled steel

NovoWeld is suitable for flat roofs with a timber, concrete or profiled steel substructure. The fasteners are matched to the substrate; with EPS insulation a PAD goes beneath the plate. Only fasteners with a system test may be used.

The exact number of fixing points is determined by a wind-load calculation based on a fully completed data collection sheet.

What the system includes

Components according to the NovoWeld information sheet. Select fasteners by substrate and system test.

  • Circular NovoWeld load-distribution plate with a central opening

    NovoWeld load-distribution plate

    Coated plate in DIN 6.8 and DIN 16.0, 200 per carton. It is screwed into the substructure and welded to the waterproofing.

  • isoweld 3000 induction welder on a wheeled frame

    isoweld® 3000 induction welder

    Self-calibrating induction welding unit. Available for hire, magnet set included.

  • Orange hand induction tool with connection cable for induction fastening

    isoweld® 3000 hand inductor

    Placed on the marked point; welds plate and waterproofing.

  • Orange plastic sleeve of the NovoWeld fastening

    Plastic sleeve

    Sleeve for fastening the plate, length to suit the roof build-up.

  • Illustrative long roof fastener with drill point

    Fasteners

    Suitable fasteners for timber, concrete or profiled steel, specified as SFS intec in the tender text. System-tested only; not supplied with the plates, quantity per wind-load calculation.

  • White round PAD for EPS insulation

    PAD for EPS insulation

    Base for the plate on EPS insulation.

  • Magnet set with rod magnets

    Magnet set

    10 magnets. They stay on the weld point for at least 1 minute until it has cooled.

AI-assisted product visualizations based on original references.

AI-assisted product visualizations based on original references.

Planning documents

Reset search and filters

Additional filters

Document type
Document type
Scope
Scope
File format
File format

1 / 1

Browse all downloads →

of

Agree the NovoWeld fastening layout

The wind-load calculation requires a fully completed data collection sheet.

Send an enquiry